Gerenciamento de risco em um projeto de transferência de tecnologia intracompanhia farmacêutica

Detalhes bibliográficos
Ano de defesa: 2017
Autor(a) principal: Barakat, Májida Farid lattes
Orientador(a): Berssaneti, Fernando Tobal
Banca de defesa: Berssaneti, Fernando Tobal, Santana, José Carlos Curvelo, Fleury, André Leme
Tipo de documento: Dissertação
Tipo de acesso: Acesso aberto
Idioma: por
Instituição de defesa: Universidade Nove de Julho
Programa de Pós-Graduação: Programa de Pós-Graduação de Mestrado e Doutorado em Engenharia de Produção
Departamento: Engenharia
País: Brasil
Palavras-chave em Português:
Palavras-chave em Inglês:
Área do conhecimento CNPq:
Link de acesso: http://bibliotecatede.uninove.br/handle/tede/1703
Resumo: This research deals with a quantitative and qualitative case study aimed at the critical analysis of the contribution of risk management in projects of pharmaceutical intracompany technology transfer. It was considered a project to change the location of manufacturing, packaging and quality control of a solid oral medicine performed at a regional level, between sites located in different municipalities of the state of São Paulo to meet the commercial strategy of a multinational pharmaceutical company. This project began in 2013, including planning, organization and execution with completion expected in 2015. A qualitative assessment of the risks related to the scope and quality requirements of the project was performed, as well as a quantitative assessment of the risks related to compliance with the project deadline. In order to confirm or refute the six research propositions presented, it was conducted semi-structured interviews and direct observation in the unit of analysis, bibliographic review and data analysis. The results show that after qualitative analysis of the project risks related to the scope and quality requirements using the Failure Mode and Effect Analysis - FMEA tool, 39 failure modes were identified, with Priority Risk Number - PRN values varying from 70 to 288, the failure modes of greater severity and therefore, priority, it was the quality requirement for health regulations. They also indicate that from the Monte Carlo Simulation the maximum expected time for the project is 1841 days and the minimum of 1473 days. The conclusion of the research shows that the propositions are not fully confirmed. An action plan was proposed to mitigate the risks analyzed.
id NOVE_c99c891e8bb7314ca61499df76abcc39
oai_identifier_str oai:localhost:tede/1703
network_acronym_str NOVE
network_name_str Biblioteca Digital de Teses e Dissertações da Uninove
repository_id_str
spelling Berssaneti, Fernando TobalBerssaneti, Fernando TobalSantana, José Carlos CurveloFleury, André Lemehttp://lattes.cnpq.br/8868794635240284Barakat, Májida Farid2017-08-04T21:37:42Z2017-03-07Barakat, Májida Farid. Gerenciamento de risco em um projeto de transferência de tecnologia intracompanhia farmacêutica. 2017. 96 f. Dissertação( Programa de Mestrado em Engenharia de Produção) - Universidade Nove de Julho, São Paulo.http://bibliotecatede.uninove.br/handle/tede/1703This research deals with a quantitative and qualitative case study aimed at the critical analysis of the contribution of risk management in projects of pharmaceutical intracompany technology transfer. It was considered a project to change the location of manufacturing, packaging and quality control of a solid oral medicine performed at a regional level, between sites located in different municipalities of the state of São Paulo to meet the commercial strategy of a multinational pharmaceutical company. This project began in 2013, including planning, organization and execution with completion expected in 2015. A qualitative assessment of the risks related to the scope and quality requirements of the project was performed, as well as a quantitative assessment of the risks related to compliance with the project deadline. In order to confirm or refute the six research propositions presented, it was conducted semi-structured interviews and direct observation in the unit of analysis, bibliographic review and data analysis. The results show that after qualitative analysis of the project risks related to the scope and quality requirements using the Failure Mode and Effect Analysis - FMEA tool, 39 failure modes were identified, with Priority Risk Number - PRN values varying from 70 to 288, the failure modes of greater severity and therefore, priority, it was the quality requirement for health regulations. They also indicate that from the Monte Carlo Simulation the maximum expected time for the project is 1841 days and the minimum of 1473 days. The conclusion of the research shows that the propositions are not fully confirmed. An action plan was proposed to mitigate the risks analyzed.Este trabalho trata de um estudo de caso quantitativo e qualitativo dirigido para a análise crítica da contribuição do gerenciamento de riscos em projetos de transferência de tecnologia intracompanhia farmacêutica. Foi considerado um projeto de alteração do local de fabricação, embalagem e controle de qualidade de um medicamento sólido oral realizado em nível regional, entre plantas localizadas em diferentes municípios do estado de São Paulo para atender a estratégia comercial de uma companhia multinacional farmacêutica. Este projeto teve início em 2013, incluindo planejamento, organização e execução com previsão de conclusão em 2015. Foi realizada análise qualitativa dos riscos relacionados aos atendimentos de escopo e requisitos da qualidade do projeto e também análise quantitativa dos riscos relacionados ao cumprimento do prazo do projeto. Para confirmar ou refutar as seis proposições de pesquisa apresentadas, foram realizadas entrevistas semiestruturadas e observação direta na unidade de análise, revisão bibliográfica e análise de dados. Os resultados mostram que após análise qualitativa dos riscos do projeto relacionados aos atendimentos de escopo e requisitos da qualidade utilizando a ferramenta Análise de Modo de Falha e seus Efeitos - FMEA, foram identificados 39 modos de falha, com valores de Número de Prioridade de Risco - NPR variando de 70 a 288, sendo os de maior severidade e, portanto, prioridade os referentes aos requisitos da qualidade quanto a regulamentação sanitária. Indicam, também, que a partir da Simulação de Monte Carlo o prazo máximo esperado para o projeto é de 1841 dias e o mínimo de 1473 dias. A conclusão da pesquisa mostra que as proposições não se confirmam de forma plena. Foi proposto um plano de ação objetivando a mitigação dos riscos analisados.Submitted by Nadir Basilio (nadirsb@uninove.br) on 2017-08-04T21:37:42Z No. of bitstreams: 1 Majida Farid Barakat.pdf: 1578082 bytes, checksum: 0ce4d1fce799ec5caafefd77e0d78c25 (MD5)Made available in DSpace on 2017-08-04T21:37:42Z (GMT). No. of bitstreams: 1 Majida Farid Barakat.pdf: 1578082 bytes, checksum: 0ce4d1fce799ec5caafefd77e0d78c25 (MD5) Previous issue date: 2017-03-07application/pdfporUniversidade Nove de JulhoPrograma de Pós-Graduação de Mestrado e Doutorado em Engenharia de ProduçãoUNINOVEBrasilEngenhariagerenciamento de projetosgerenciamento de riscoprojeto de transferência de tecnologiaproject managementrisk managementtechnology transfer projectENGENHARIAS::ENGENHARIA DE PRODUCAOGerenciamento de risco em um projeto de transferência de tecnologia intracompanhia farmacêuticaRisk management in an intracompany pharmaceutical technology transfer projectinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesis2551182063231974631600info:eu-repo/semantics/openAccessreponame:Biblioteca Digital de Teses e Dissertações da Uninoveinstname:Universidade Nove de Julho (UNINOVE)instacron:UNINOVEORIGINALMajida Farid Barakat.pdfMajida Farid Barakat.pdfapplication/pdf1578082http://localhost:8080/tede/bitstream/tede/1703/2/Majida+Farid+Barakat.pdf0ce4d1fce799ec5caafefd77e0d78c25MD52LICENSElicense.txtlicense.txttext/plain; charset=utf-82165http://localhost:8080/tede/bitstream/tede/1703/1/license.txtbd3efa91386c1718a7f26a329fdcb468MD51tede/17032021-10-08 17:07:52.802oai:localhost:tede/1703Tk9UQTogQ09MT1FVRSBBUVVJIEEgU1VBIFBSw5NQUklBIExJQ0VOw4dBCkVzdGEgbGljZW7Dp2EgZGUgZXhlbXBsbyDDqSBmb3JuZWNpZGEgYXBlbmFzIHBhcmEgZmlucyBpbmZvcm1hdGl2b3MuCgpMSUNFTsOHQSBERSBESVNUUklCVUnDh8ODTyBOw4NPLUVYQ0xVU0lWQQoKQ29tIGEgYXByZXNlbnRhw6fDo28gZGVzdGEgbGljZW7Dp2EsIHZvY8OqIChvIGF1dG9yIChlcykgb3UgbyB0aXR1bGFyIGRvcyBkaXJlaXRvcyBkZSBhdXRvcikgY29uY2VkZSDDoCBVbml2ZXJzaWRhZGUgClhYWCAoU2lnbGEgZGEgVW5pdmVyc2lkYWRlKSBvIGRpcmVpdG8gbsOjby1leGNsdXNpdm8gZGUgcmVwcm9kdXppciwgIHRyYWR1emlyIChjb25mb3JtZSBkZWZpbmlkbyBhYmFpeG8pLCBlL291IApkaXN0cmlidWlyIGEgc3VhIHRlc2Ugb3UgZGlzc2VydGHDp8OjbyAoaW5jbHVpbmRvIG8gcmVzdW1vKSBwb3IgdG9kbyBvIG11bmRvIG5vIGZvcm1hdG8gaW1wcmVzc28gZSBlbGV0csO0bmljbyBlIAplbSBxdWFscXVlciBtZWlvLCBpbmNsdWluZG8gb3MgZm9ybWF0b3Mgw6F1ZGlvIG91IHbDrWRlby4KClZvY8OqIGNvbmNvcmRhIHF1ZSBhIFNpZ2xhIGRlIFVuaXZlcnNpZGFkZSBwb2RlLCBzZW0gYWx0ZXJhciBvIGNvbnRlw7pkbywgdHJhbnNwb3IgYSBzdWEgdGVzZSBvdSBkaXNzZXJ0YcOnw6NvIApwYXJhIHF1YWxxdWVyIG1laW8gb3UgZm9ybWF0byBwYXJhIGZpbnMgZGUgcHJlc2VydmHDp8Ojby4KClZvY8OqIHRhbWLDqW0gY29uY29yZGEgcXVlIGEgU2lnbGEgZGUgVW5pdmVyc2lkYWRlIHBvZGUgbWFudGVyIG1haXMgZGUgdW1hIGPDs3BpYSBhIHN1YSB0ZXNlIG91IApkaXNzZXJ0YcOnw6NvIHBhcmEgZmlucyBkZSBzZWd1cmFuw6dhLCBiYWNrLXVwIGUgcHJlc2VydmHDp8Ojby4KClZvY8OqIGRlY2xhcmEgcXVlIGEgc3VhIHRlc2Ugb3UgZGlzc2VydGHDp8OjbyDDqSBvcmlnaW5hbCBlIHF1ZSB2b2PDqiB0ZW0gbyBwb2RlciBkZSBjb25jZWRlciBvcyBkaXJlaXRvcyBjb250aWRvcyAKbmVzdGEgbGljZW7Dp2EuIFZvY8OqIHRhbWLDqW0gZGVjbGFyYSBxdWUgbyBkZXDDs3NpdG8gZGEgc3VhIHRlc2Ugb3UgZGlzc2VydGHDp8OjbyBuw6NvLCBxdWUgc2VqYSBkZSBzZXUgCmNvbmhlY2ltZW50bywgaW5mcmluZ2UgZGlyZWl0b3MgYXV0b3JhaXMgZGUgbmluZ3XDqW0uCgpDYXNvIGEgc3VhIHRlc2Ugb3UgZGlzc2VydGHDp8OjbyBjb250ZW5oYSBtYXRlcmlhbCBxdWUgdm9jw6ogbsOjbyBwb3NzdWkgYSB0aXR1bGFyaWRhZGUgZG9zIGRpcmVpdG9zIGF1dG9yYWlzLCB2b2PDqiAKZGVjbGFyYSBxdWUgb2J0ZXZlIGEgcGVybWlzc8OjbyBpcnJlc3RyaXRhIGRvIGRldGVudG9yIGRvcyBkaXJlaXRvcyBhdXRvcmFpcyBwYXJhIGNvbmNlZGVyIMOgIFNpZ2xhIGRlIFVuaXZlcnNpZGFkZSAKb3MgZGlyZWl0b3MgYXByZXNlbnRhZG9zIG5lc3RhIGxpY2Vuw6dhLCBlIHF1ZSBlc3NlIG1hdGVyaWFsIGRlIHByb3ByaWVkYWRlIGRlIHRlcmNlaXJvcyBlc3TDoSBjbGFyYW1lbnRlIAppZGVudGlmaWNhZG8gZSByZWNvbmhlY2lkbyBubyB0ZXh0byBvdSBubyBjb250ZcO6ZG8gZGEgdGVzZSBvdSBkaXNzZXJ0YcOnw6NvIG9yYSBkZXBvc2l0YWRhLgoKQ0FTTyBBIFRFU0UgT1UgRElTU0VSVEHDh8ODTyBPUkEgREVQT1NJVEFEQSBURU5IQSBTSURPIFJFU1VMVEFETyBERSBVTSBQQVRST0PDjU5JTyBPVSAKQVBPSU8gREUgVU1BIEFHw4pOQ0lBIERFIEZPTUVOVE8gT1UgT1VUUk8gT1JHQU5JU01PIFFVRSBOw4NPIFNFSkEgQSBTSUdMQSBERSAKVU5JVkVSU0lEQURFLCBWT0PDiiBERUNMQVJBIFFVRSBSRVNQRUlUT1UgVE9ET1MgRSBRVUFJU1FVRVIgRElSRUlUT1MgREUgUkVWSVPDg08gQ09NTyAKVEFNQsOJTSBBUyBERU1BSVMgT0JSSUdBw4fDlUVTIEVYSUdJREFTIFBPUiBDT05UUkFUTyBPVSBBQ09SRE8uCgpBIFNpZ2xhIGRlIFVuaXZlcnNpZGFkZSBzZSBjb21wcm9tZXRlIGEgaWRlbnRpZmljYXIgY2xhcmFtZW50ZSBvIHNldSBub21lIChzKSBvdSBvKHMpIG5vbWUocykgZG8ocykgCmRldGVudG9yKGVzKSBkb3MgZGlyZWl0b3MgYXV0b3JhaXMgZGEgdGVzZSBvdSBkaXNzZXJ0YcOnw6NvLCBlIG7Do28gZmFyw6EgcXVhbHF1ZXIgYWx0ZXJhw6fDo28sIGFsw6ltIGRhcXVlbGFzIApjb25jZWRpZGFzIHBvciBlc3RhIGxpY2Vuw6dhLgo=Biblioteca Digital de Teses e Dissertaçõeshttp://bibliotecatede.uninove.br/PRIhttp://bibliotecatede.uninove.br/oai/requestbibliotecatede@uninove.br||bibliotecatede@uninove.bropendoar:2021-10-08T20:07:52Biblioteca Digital de Teses e Dissertações da Uninove - Universidade Nove de Julho (UNINOVE)false
dc.title.por.fl_str_mv Gerenciamento de risco em um projeto de transferência de tecnologia intracompanhia farmacêutica
dc.title.alternative.eng.fl_str_mv Risk management in an intracompany pharmaceutical technology transfer project
title Gerenciamento de risco em um projeto de transferência de tecnologia intracompanhia farmacêutica
spellingShingle Gerenciamento de risco em um projeto de transferência de tecnologia intracompanhia farmacêutica
Barakat, Májida Farid
gerenciamento de projetos
gerenciamento de risco
projeto de transferência de tecnologia
project management
risk management
technology transfer project
ENGENHARIAS::ENGENHARIA DE PRODUCAO
title_short Gerenciamento de risco em um projeto de transferência de tecnologia intracompanhia farmacêutica
title_full Gerenciamento de risco em um projeto de transferência de tecnologia intracompanhia farmacêutica
title_fullStr Gerenciamento de risco em um projeto de transferência de tecnologia intracompanhia farmacêutica
title_full_unstemmed Gerenciamento de risco em um projeto de transferência de tecnologia intracompanhia farmacêutica
title_sort Gerenciamento de risco em um projeto de transferência de tecnologia intracompanhia farmacêutica
author Barakat, Májida Farid
author_facet Barakat, Májida Farid
author_role author
dc.contributor.advisor1.fl_str_mv Berssaneti, Fernando Tobal
dc.contributor.referee1.fl_str_mv Berssaneti, Fernando Tobal
dc.contributor.referee2.fl_str_mv Santana, José Carlos Curvelo
dc.contributor.referee3.fl_str_mv Fleury, André Leme
dc.contributor.authorLattes.fl_str_mv http://lattes.cnpq.br/8868794635240284
dc.contributor.author.fl_str_mv Barakat, Májida Farid
contributor_str_mv Berssaneti, Fernando Tobal
Berssaneti, Fernando Tobal
Santana, José Carlos Curvelo
Fleury, André Leme
dc.subject.por.fl_str_mv gerenciamento de projetos
gerenciamento de risco
projeto de transferência de tecnologia
topic gerenciamento de projetos
gerenciamento de risco
projeto de transferência de tecnologia
project management
risk management
technology transfer project
ENGENHARIAS::ENGENHARIA DE PRODUCAO
dc.subject.eng.fl_str_mv project management
risk management
technology transfer project
dc.subject.cnpq.fl_str_mv ENGENHARIAS::ENGENHARIA DE PRODUCAO
description This research deals with a quantitative and qualitative case study aimed at the critical analysis of the contribution of risk management in projects of pharmaceutical intracompany technology transfer. It was considered a project to change the location of manufacturing, packaging and quality control of a solid oral medicine performed at a regional level, between sites located in different municipalities of the state of São Paulo to meet the commercial strategy of a multinational pharmaceutical company. This project began in 2013, including planning, organization and execution with completion expected in 2015. A qualitative assessment of the risks related to the scope and quality requirements of the project was performed, as well as a quantitative assessment of the risks related to compliance with the project deadline. In order to confirm or refute the six research propositions presented, it was conducted semi-structured interviews and direct observation in the unit of analysis, bibliographic review and data analysis. The results show that after qualitative analysis of the project risks related to the scope and quality requirements using the Failure Mode and Effect Analysis - FMEA tool, 39 failure modes were identified, with Priority Risk Number - PRN values varying from 70 to 288, the failure modes of greater severity and therefore, priority, it was the quality requirement for health regulations. They also indicate that from the Monte Carlo Simulation the maximum expected time for the project is 1841 days and the minimum of 1473 days. The conclusion of the research shows that the propositions are not fully confirmed. An action plan was proposed to mitigate the risks analyzed.
publishDate 2017
dc.date.accessioned.fl_str_mv 2017-08-04T21:37:42Z
dc.date.issued.fl_str_mv 2017-03-07
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/masterThesis
format masterThesis
status_str publishedVersion
dc.identifier.citation.fl_str_mv Barakat, Májida Farid. Gerenciamento de risco em um projeto de transferência de tecnologia intracompanhia farmacêutica. 2017. 96 f. Dissertação( Programa de Mestrado em Engenharia de Produção) - Universidade Nove de Julho, São Paulo.
dc.identifier.uri.fl_str_mv http://bibliotecatede.uninove.br/handle/tede/1703
identifier_str_mv Barakat, Májida Farid. Gerenciamento de risco em um projeto de transferência de tecnologia intracompanhia farmacêutica. 2017. 96 f. Dissertação( Programa de Mestrado em Engenharia de Produção) - Universidade Nove de Julho, São Paulo.
url http://bibliotecatede.uninove.br/handle/tede/1703
dc.language.iso.fl_str_mv por
language por
dc.relation.cnpq.fl_str_mv 2551182063231974631
dc.relation.confidence.fl_str_mv 600
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidade Nove de Julho
dc.publisher.program.fl_str_mv Programa de Pós-Graduação de Mestrado e Doutorado em Engenharia de Produção
dc.publisher.initials.fl_str_mv UNINOVE
dc.publisher.country.fl_str_mv Brasil
dc.publisher.department.fl_str_mv Engenharia
publisher.none.fl_str_mv Universidade Nove de Julho
dc.source.none.fl_str_mv reponame:Biblioteca Digital de Teses e Dissertações da Uninove
instname:Universidade Nove de Julho (UNINOVE)
instacron:UNINOVE
instname_str Universidade Nove de Julho (UNINOVE)
instacron_str UNINOVE
institution UNINOVE
reponame_str Biblioteca Digital de Teses e Dissertações da Uninove
collection Biblioteca Digital de Teses e Dissertações da Uninove
bitstream.url.fl_str_mv http://localhost:8080/tede/bitstream/tede/1703/2/Majida+Farid+Barakat.pdf
http://localhost:8080/tede/bitstream/tede/1703/1/license.txt
bitstream.checksum.fl_str_mv 0ce4d1fce799ec5caafefd77e0d78c25
bd3efa91386c1718a7f26a329fdcb468
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
repository.name.fl_str_mv Biblioteca Digital de Teses e Dissertações da Uninove - Universidade Nove de Julho (UNINOVE)
repository.mail.fl_str_mv bibliotecatede@uninove.br||bibliotecatede@uninove.br
_version_ 1797250753633452032