Influ??ncia dos fatores de riscos no gerenciamento dos projetos de infraestrutura

Detalhes bibliográficos
Ano de defesa: 2015
Autor(a) principal: Girardi, Leandro Ranolfi lattes
Orientador(a): Rabechini Junior, Roque lattes
Banca de defesa: Rovai, Riccardo Leonardo, Cattini Junior, Orlando
Tipo de documento: Dissertação
Tipo de acesso: Acesso aberto
Idioma: por
Instituição de defesa: Universidade Nove de Julho
Programa de Pós-Graduação: Programa de P??s-Gradua????o em Gest??o de Projetos
Departamento: Administra????o
País: Brasil
Palavras-chave em Português:
Palavras-chave em Inglês:
Área do conhecimento CNPq:
Link de acesso: https://bibliotecatede.uninove.br/handle/tede/985
Resumo: Investments in infrastructure projects are strategic for the economic, social and cultural development of a country. The world's annual investment estimate in the order of $ 3.4 trillion until 2030, or about 4 percent of gross domestic product (GDP), in infrastructure projects. In Brazil, the rate of investment in this type of venture hits the mark of 9.9 percent of GDP, reaching levels close to those of developed countries. In terms of investment, the country experiences a propitious moment for new infrastructure projects, mainly through public private partnerships (PPPs), however when these are evaluated by the managerial aspect, one realizes that deficiencies in how they are administered, limit the scope of its objectives. These projects involve multiple risk factors and the success in its implementation depends on the effectiveness of its management, whose speeches go beyond using simple analytical techniques. Thus, this study assesses the influence of risk factors on the performance of infrastructure projects. To this end, uses the theoretical reference associated with both the literature focused on the risk management but also to literature on complexity and performance. From the literature, have been prepared seven study of propositions and a general hypothesis that formed the basis for the development of field research in five projects, all belonging to different economic sectors in the Brazilian scenario. The methodology predicted the development of the survey method in complementarity to the study of multiple cases, by which the information gathered in the projects were analyzed together and cross form, enabling more robust identification of risk factors and their influence on dimensions of assessed performance. The empirical evidence suggests that there are groups of risk factors that are associated with projects with varying degrees of impact on performance. It was observed, in addition, that the efficiency is achieved when the intensity in managing the risks and complexity management style applied are compatible to the type of enterprise (typification). It was noted, therefore, that depending on the risk factor involved, the influence generated by it can have different magnitudes and influence specific performance dimensions in the projects, especially if the intensity in the management of risk is low. Stresses therefore the need for greater training of managers, in terms of knowledge and skills, so that risk management is more efficient and better performances are achieved.
id NOVE_d73e7267448f03f4b000cd37e6fb7f4a
oai_identifier_str oai:localhost:tede/985
network_acronym_str NOVE
network_name_str Biblioteca Digital de Teses e Dissertações da Uninove
repository_id_str
spelling Rabechini Junior, Roquehttp://lattes.cnpq.br/1996533325699482Rovai, Riccardo LeonardoCattini Junior, Orlando21805151894http://lattes.cnpq.br/3049303548582671Girardi, Leandro Ranolfi2015-05-07T18:30:57Z2015-02-12https://bibliotecatede.uninove.br/handle/tede/985Investments in infrastructure projects are strategic for the economic, social and cultural development of a country. The world's annual investment estimate in the order of $ 3.4 trillion until 2030, or about 4 percent of gross domestic product (GDP), in infrastructure projects. In Brazil, the rate of investment in this type of venture hits the mark of 9.9 percent of GDP, reaching levels close to those of developed countries. In terms of investment, the country experiences a propitious moment for new infrastructure projects, mainly through public private partnerships (PPPs), however when these are evaluated by the managerial aspect, one realizes that deficiencies in how they are administered, limit the scope of its objectives. These projects involve multiple risk factors and the success in its implementation depends on the effectiveness of its management, whose speeches go beyond using simple analytical techniques. Thus, this study assesses the influence of risk factors on the performance of infrastructure projects. To this end, uses the theoretical reference associated with both the literature focused on the risk management but also to literature on complexity and performance. From the literature, have been prepared seven study of propositions and a general hypothesis that formed the basis for the development of field research in five projects, all belonging to different economic sectors in the Brazilian scenario. The methodology predicted the development of the survey method in complementarity to the study of multiple cases, by which the information gathered in the projects were analyzed together and cross form, enabling more robust identification of risk factors and their influence on dimensions of assessed performance. The empirical evidence suggests that there are groups of risk factors that are associated with projects with varying degrees of impact on performance. It was observed, in addition, that the efficiency is achieved when the intensity in managing the risks and complexity management style applied are compatible to the type of enterprise (typification). It was noted, therefore, that depending on the risk factor involved, the influence generated by it can have different magnitudes and influence specific performance dimensions in the projects, especially if the intensity in the management of risk is low. Stresses therefore the need for greater training of managers, in terms of knowledge and skills, so that risk management is more efficient and better performances are achieved.Investimentos em projetos de infraestrutura s??o estrat??gicos para o desenvolvimento econ??mico, social e cultural de um pa??s. A estimativa mundial ?? de investimentos anuais na ordem de US$ 3,4 trilh??es at?? 2030, ou aproximadamente 4% do Produto Interno Bruto (PIB), em projetos de infraestrutura. No Brasil, a taxa de investimento neste tipo de empreendimento atinge a marca de 9,9% do PIB, alcan??ando ??ndices pr??ximos aos de pa??ses desenvolvidos. Em termos de investimento, o pa??s vivencia um momento prop??cio para novos projetos de infraestrutura, principalmente por meio de parcerias p??blico privadas (PPPs), por??m quando estes s??o avaliados pela vertente gerencial, percebe-se que defici??ncias na forma como eles s??o administrados, limitam o alcance dos seus objetivos. Estes projetos envolvem v??rios fatores de riscos e o sucesso na sua implementa????o depende da efetividade do seu gerenciamento, cujas interven????es v??o al??m do uso de simples t??cnicas anal??ticas. Assim, este estudo avalia qual a influ??ncia dos fatores de riscos no desempenho dos projetos de infraestrutura. Para tal, utiliza o referencial te??rico associado tanto ?? literatura voltada para o gerenciamento de riscos como tamb??m ?? literatura sobre complexidade e desempenho. A partir do levantamento bibliogr??fico, foram elaboradas sete proposi????es de estudo e uma hip??tese geral que serviram de base para o desenvolvimento da pesquisa de campo junto a cinco projetos, todos pertencentes a diferentes segmentos econ??micos no cen??rio brasileiro. A metodologia usada previu o desenvolvimento do m??todo de levantamento em complementariedade ao estudo de casos m??ltiplos, atrav??s do qual as informa????es colhidas nos empreendimentos foram analisadas em conjunto e de forma cruzada, possibilitando a identifica????o mais robusta dos fatores de riscos e as respectivas influ??ncias nas dimens??es de desempenho avaliadas. As evid??ncias emp??ricas sugerem que existem grupos de fatores de riscos que est??o associados a projetos com diferentes graus de impacto no desempenho. Observou-se, complementarmente, que a efici??ncia ?? alcan??ada quando a intensidade no gerenciamento dos riscos e o estilo de gest??o da complexidade aplicados s??o compat??veis ao tipo de empreendimento (tipifica????o). Constatou-se, desta forma, que dependendo do tipo de fator de risco envolvido, a influ??ncia gerada por ele pode ter diferentes magnitudes e impactar dimens??es de desempenho espec??ficas nos projetos, principalmente se a intensidade no gerenciamento dos riscos for baixa. Ressalta-se, assim, a necessidade de maior preparo dos gerentes, em termos de conhecimento e habilidades, para que o gerenciamento de riscos seja mais eficiente e melhores desempenhos sejam conquistados.Submitted by Nadir Basilio (nadirsb@uninove.br) on 2015-05-07T18:30:57Z No. of bitstreams: 1 Leandro Ranolfi Girardi.pdf: 2924915 bytes, checksum: 05b9c25c3974373dac376031e8e880ef (MD5)Made available in DSpace on 2015-05-07T18:30:57Z (GMT). No. of bitstreams: 1 Leandro Ranolfi Girardi.pdf: 2924915 bytes, checksum: 05b9c25c3974373dac376031e8e880ef (MD5) Previous issue date: 2015-02-12application/pdfporUniversidade Nove de JulhoPrograma de P??s-Gradua????o em Gest??o de ProjetosUninoveBrasilAdministra????oprojeto de infraestruturadesempenhogerenciamento de riscofator de riscocomplexidadeinfrastructure projectperformancerisk managementrisk factorcomplexityCIENCIAS SOCIAIS APLICADAS::ADMINISTRACAOInflu??ncia dos fatores de riscos no gerenciamento dos projetos de infraestruturaInfluence of risk factors in the management of the infrastructure projectsinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesis8024035432632778221600info:eu-repo/semantics/openAccessreponame:Biblioteca Digital de Teses e Dissertações da Uninoveinstname:Universidade Nove de Julho (UNINOVE)instacron:UNINOVEORIGINALLeandro Ranolfi Girardi.pdfLeandro Ranolfi Girardi.pdfapplication/pdf2924915http://localhost:8080/tede/bitstream/tede/985/2/Leandro+Ranolfi+Girardi.pdf05b9c25c3974373dac376031e8e880efMD52LICENSElicense.txtlicense.txttext/plain; charset=utf-82165http://localhost:8080/tede/bitstream/tede/985/1/license.txta29ee53e1b3208ad99592263fc80192aMD51tede/9852019-06-19 15:50:47.421oai:localhost: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Biblioteca Digital de Teses e Dissertaçõeshttp://bibliotecatede.uninove.br/PRIhttp://bibliotecatede.uninove.br/oai/requestbibliotecatede@uninove.br||bibliotecatede@uninove.bropendoar:2019-06-19T18:50:47Biblioteca Digital de Teses e Dissertações da Uninove - Universidade Nove de Julho (UNINOVE)false
dc.title.por.fl_str_mv Influ??ncia dos fatores de riscos no gerenciamento dos projetos de infraestrutura
dc.title.alternative.eng.fl_str_mv Influence of risk factors in the management of the infrastructure projects
title Influ??ncia dos fatores de riscos no gerenciamento dos projetos de infraestrutura
spellingShingle Influ??ncia dos fatores de riscos no gerenciamento dos projetos de infraestrutura
Girardi, Leandro Ranolfi
projeto de infraestrutura
desempenho
gerenciamento de risco
fator de risco
complexidade
infrastructure project
performance
risk management
risk factor
complexity
CIENCIAS SOCIAIS APLICADAS::ADMINISTRACAO
title_short Influ??ncia dos fatores de riscos no gerenciamento dos projetos de infraestrutura
title_full Influ??ncia dos fatores de riscos no gerenciamento dos projetos de infraestrutura
title_fullStr Influ??ncia dos fatores de riscos no gerenciamento dos projetos de infraestrutura
title_full_unstemmed Influ??ncia dos fatores de riscos no gerenciamento dos projetos de infraestrutura
title_sort Influ??ncia dos fatores de riscos no gerenciamento dos projetos de infraestrutura
author Girardi, Leandro Ranolfi
author_facet Girardi, Leandro Ranolfi
author_role author
dc.contributor.advisor1.fl_str_mv Rabechini Junior, Roque
dc.contributor.advisor1Lattes.fl_str_mv http://lattes.cnpq.br/1996533325699482
dc.contributor.referee1.fl_str_mv Rovai, Riccardo Leonardo
dc.contributor.referee2.fl_str_mv Cattini Junior, Orlando
dc.contributor.authorID.fl_str_mv 21805151894
dc.contributor.authorLattes.fl_str_mv http://lattes.cnpq.br/3049303548582671
dc.contributor.author.fl_str_mv Girardi, Leandro Ranolfi
contributor_str_mv Rabechini Junior, Roque
Rovai, Riccardo Leonardo
Cattini Junior, Orlando
dc.subject.por.fl_str_mv projeto de infraestrutura
desempenho
gerenciamento de risco
fator de risco
complexidade
topic projeto de infraestrutura
desempenho
gerenciamento de risco
fator de risco
complexidade
infrastructure project
performance
risk management
risk factor
complexity
CIENCIAS SOCIAIS APLICADAS::ADMINISTRACAO
dc.subject.eng.fl_str_mv infrastructure project
performance
risk management
risk factor
complexity
dc.subject.cnpq.fl_str_mv CIENCIAS SOCIAIS APLICADAS::ADMINISTRACAO
description Investments in infrastructure projects are strategic for the economic, social and cultural development of a country. The world's annual investment estimate in the order of $ 3.4 trillion until 2030, or about 4 percent of gross domestic product (GDP), in infrastructure projects. In Brazil, the rate of investment in this type of venture hits the mark of 9.9 percent of GDP, reaching levels close to those of developed countries. In terms of investment, the country experiences a propitious moment for new infrastructure projects, mainly through public private partnerships (PPPs), however when these are evaluated by the managerial aspect, one realizes that deficiencies in how they are administered, limit the scope of its objectives. These projects involve multiple risk factors and the success in its implementation depends on the effectiveness of its management, whose speeches go beyond using simple analytical techniques. Thus, this study assesses the influence of risk factors on the performance of infrastructure projects. To this end, uses the theoretical reference associated with both the literature focused on the risk management but also to literature on complexity and performance. From the literature, have been prepared seven study of propositions and a general hypothesis that formed the basis for the development of field research in five projects, all belonging to different economic sectors in the Brazilian scenario. The methodology predicted the development of the survey method in complementarity to the study of multiple cases, by which the information gathered in the projects were analyzed together and cross form, enabling more robust identification of risk factors and their influence on dimensions of assessed performance. The empirical evidence suggests that there are groups of risk factors that are associated with projects with varying degrees of impact on performance. It was observed, in addition, that the efficiency is achieved when the intensity in managing the risks and complexity management style applied are compatible to the type of enterprise (typification). It was noted, therefore, that depending on the risk factor involved, the influence generated by it can have different magnitudes and influence specific performance dimensions in the projects, especially if the intensity in the management of risk is low. Stresses therefore the need for greater training of managers, in terms of knowledge and skills, so that risk management is more efficient and better performances are achieved.
publishDate 2015
dc.date.accessioned.fl_str_mv 2015-05-07T18:30:57Z
dc.date.issued.fl_str_mv 2015-02-12
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/masterThesis
format masterThesis
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://bibliotecatede.uninove.br/handle/tede/985
url https://bibliotecatede.uninove.br/handle/tede/985
dc.language.iso.fl_str_mv por
language por
dc.relation.cnpq.fl_str_mv 8024035432632778221
dc.relation.confidence.fl_str_mv 600
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidade Nove de Julho
dc.publisher.program.fl_str_mv Programa de P??s-Gradua????o em Gest??o de Projetos
dc.publisher.initials.fl_str_mv Uninove
dc.publisher.country.fl_str_mv Brasil
dc.publisher.department.fl_str_mv Administra????o
publisher.none.fl_str_mv Universidade Nove de Julho
dc.source.none.fl_str_mv reponame:Biblioteca Digital de Teses e Dissertações da Uninove
instname:Universidade Nove de Julho (UNINOVE)
instacron:UNINOVE
instname_str Universidade Nove de Julho (UNINOVE)
instacron_str UNINOVE
institution UNINOVE
reponame_str Biblioteca Digital de Teses e Dissertações da Uninove
collection Biblioteca Digital de Teses e Dissertações da Uninove
bitstream.url.fl_str_mv http://localhost:8080/tede/bitstream/tede/985/2/Leandro+Ranolfi+Girardi.pdf
http://localhost:8080/tede/bitstream/tede/985/1/license.txt
bitstream.checksum.fl_str_mv 05b9c25c3974373dac376031e8e880ef
a29ee53e1b3208ad99592263fc80192a
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
repository.name.fl_str_mv Biblioteca Digital de Teses e Dissertações da Uninove - Universidade Nove de Julho (UNINOVE)
repository.mail.fl_str_mv bibliotecatede@uninove.br||bibliotecatede@uninove.br
_version_ 1797250746811416576