Impacto do processo de manutenção de via permanente e eletroeletrônica na logística de transporte ferroviário
Ano de defesa: | 2020 |
---|---|
Autor(a) principal: | |
Orientador(a): | |
Banca de defesa: | , , |
Tipo de documento: | Dissertação |
Tipo de acesso: | Acesso aberto |
Idioma: | por |
Instituição de defesa: |
Universidade Federal do Maranhão
|
Programa de Pós-Graduação: |
PROGRAMA DE PÓS-GRADUAÇÃO EM ENERGIA E AMBIENTE/CCET
|
Departamento: |
DEPARTAMENTO DE ENGENHARIA DA ELETRICIDADE/CCET
|
País: |
Brasil
|
Palavras-chave em Português: | |
Palavras-chave em Inglês: | |
Área do conhecimento CNPq: | |
Link de acesso: | https://tedebc.ufma.br/jspui/handle/tede/tede/3198 |
Resumo: | This work aims to present the impact of the maintenance process of permanent and electro-electronic track in a Heavy Haul railway. The study points out the comparison between the basic, blocked maintenance and maintenance by distance formats applied between 2017 and 2019 (36 months) through the assessment of railway performance indicators. The performance of the failures of track and electro-electronic area, of the train hour stopped indicator, of the mean kilometer between stops indicator and the specific consumption yield were considered, using statistical analysis with ANOVA and Tukey tests, through the MATLAB® software by MathWorks. The conclusion of the analyzes allowed to indicate a better performance for the maintenance by distance format in the railway under study, ratified in the tests showed according to the characteristics indicated in these 3 years of evaluation of the numerical basis caused by the capacity increase process (railway duplication). |
id |
UFMA_4e6bc817a28959cd2ead16a225fc6d8c |
---|---|
oai_identifier_str |
oai:tede2:tede/3198 |
network_acronym_str |
UFMA |
network_name_str |
Biblioteca Digital de Teses e Dissertações da UFMA |
repository_id_str |
|
spelling |
SINFRÔNIO, Francisco Sávio Mendes008865174-60http://lattes.cnpq.br/5984945942545807SANTOS NETO, Inocêncio Sanches dos003589933-69http://lattes.cnpq.br/8490778593339511SINFRÔNIO, Francisco Sávio Mendes008865174-60http://lattes.cnpq.br/5984945942545807COELHO, Paulo Henrique da Silva Leitehttp://lattes.cnpq.br/6597430849631821PINTO, Mauro Sérgio Silvahttp://lattes.cnpq.br/0804349408744542893236703-59http://lattes.cnpq.br/1406951147120069TERCEIRO, Lizandro do Amaral Oliveira2021-02-18T19:31:17Z2020-09-18TERCEIRO, Lizandro do Amaral Oliveira. Impacto do processo de manutenção de via permanente e eletroeletrônica na logística de transporte ferroviário. 2020.96 f. Dissertação (Programa de Pós-Graduação em Energia e Ambiente/CCET) - Universidade Federal do Maranhão, São Luís, 2020.https://tedebc.ufma.br/jspui/handle/tede/tede/3198This work aims to present the impact of the maintenance process of permanent and electro-electronic track in a Heavy Haul railway. The study points out the comparison between the basic, blocked maintenance and maintenance by distance formats applied between 2017 and 2019 (36 months) through the assessment of railway performance indicators. The performance of the failures of track and electro-electronic area, of the train hour stopped indicator, of the mean kilometer between stops indicator and the specific consumption yield were considered, using statistical analysis with ANOVA and Tukey tests, through the MATLAB® software by MathWorks. The conclusion of the analyzes allowed to indicate a better performance for the maintenance by distance format in the railway under study, ratified in the tests showed according to the characteristics indicated in these 3 years of evaluation of the numerical basis caused by the capacity increase process (railway duplication).Este trabalho visa apresentar o impacto do processo de manutenção de via permanente e eletroeletrônica em uma ferrovia de característica Heavy Haul. O estudo aponta o comparativo entre os formatos de manutenção básica, blocada e por distanciamento aplicados entre 2017 e 2019 (36 meses) através da avaliação dos indicadores de performance ferroviária. Foram consideradas as performances das falhas de via permanente e eletroeletrônica, do indicador trem hora parado, do indicador quilômetro médio entre paradas e por último o consumo específico, utilizando análise estatística com os testes ANOVA e de Tukey, através do software MATLAB® da MathWorks. A conclusão das análises permitiu indicar um rendimento melhor estabelecido para o formato de manutenção por distanciamento na ferrovia em estudo, ratificada nos testes apontados de acordo com as características indicadas nesses 3 anos de avaliação da base numérica causada pelo processo de aumento de capacidade (duplicação ferroviária).Submitted by Daniella Santos (daniella.santos@ufma.br) on 2021-02-18T19:31:17Z No. of bitstreams: 1 LizandroTerceiro.pdf: 4404060 bytes, checksum: 1e054157d27533930edef3b24e7bf433 (MD5)Made available in DSpace on 2021-02-18T19:31:17Z (GMT). No. of bitstreams: 1 LizandroTerceiro.pdf: 4404060 bytes, checksum: 1e054157d27533930edef3b24e7bf433 (MD5) Previous issue date: 2020-09-18application/pdfporUniversidade Federal do MaranhãoPROGRAMA DE PÓS-GRADUAÇÃO EM ENERGIA E AMBIENTE/CCETUFMABrasilDEPARTAMENTO DE ENGENHARIA DA ELETRICIDADE/CCETFerrovia Heavy HaulManutençãoEstatísticaTeste ANOVATeste TukeyHeavy haul railwayMaintenanceStatisticANOVA testTukey testFerrovias; Projetos e ConstruçãoImpacto do processo de manutenção de via permanente e eletroeletrônica na logística de transporte ferroviárioImpact of the maintenance process of permanent and electro-electronic track on railway transport logisticsinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesisinfo:eu-repo/semantics/openAccessreponame:Biblioteca Digital de Teses e Dissertações da UFMAinstname:Universidade Federal do Maranhão (UFMA)instacron:UFMAORIGINALLizandroTerceiro.pdfLizandroTerceiro.pdfapplication/pdf4404060http://tedebc.ufma.br:8080/bitstream/tede/3198/2/LizandroTerceiro.pdf1e054157d27533930edef3b24e7bf433MD52LICENSElicense.txtlicense.txttext/plain; charset=utf-82255http://tedebc.ufma.br:8080/bitstream/tede/3198/1/license.txt97eeade1fce43278e63fe063657f8083MD51tede/31982021-02-18 16:31:17.278oai:tede2: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Biblioteca Digital de Teses e Dissertaçõeshttps://tedebc.ufma.br/jspui/PUBhttp://tedebc.ufma.br:8080/oai/requestrepositorio@ufma.br||repositorio@ufma.bropendoar:21312021-02-18T19:31:17Biblioteca Digital de Teses e Dissertações da UFMA - Universidade Federal do Maranhão (UFMA)false |
dc.title.por.fl_str_mv |
Impacto do processo de manutenção de via permanente e eletroeletrônica na logística de transporte ferroviário |
dc.title.alternative.eng.fl_str_mv |
Impact of the maintenance process of permanent and electro-electronic track on railway transport logistics |
title |
Impacto do processo de manutenção de via permanente e eletroeletrônica na logística de transporte ferroviário |
spellingShingle |
Impacto do processo de manutenção de via permanente e eletroeletrônica na logística de transporte ferroviário TERCEIRO, Lizandro do Amaral Oliveira Ferrovia Heavy Haul Manutenção Estatística Teste ANOVA Teste Tukey Heavy haul railway Maintenance Statistic ANOVA test Tukey test Ferrovias; Projetos e Construção |
title_short |
Impacto do processo de manutenção de via permanente e eletroeletrônica na logística de transporte ferroviário |
title_full |
Impacto do processo de manutenção de via permanente e eletroeletrônica na logística de transporte ferroviário |
title_fullStr |
Impacto do processo de manutenção de via permanente e eletroeletrônica na logística de transporte ferroviário |
title_full_unstemmed |
Impacto do processo de manutenção de via permanente e eletroeletrônica na logística de transporte ferroviário |
title_sort |
Impacto do processo de manutenção de via permanente e eletroeletrônica na logística de transporte ferroviário |
author |
TERCEIRO, Lizandro do Amaral Oliveira |
author_facet |
TERCEIRO, Lizandro do Amaral Oliveira |
author_role |
author |
dc.contributor.advisor1.fl_str_mv |
SINFRÔNIO, Francisco Sávio Mendes |
dc.contributor.advisor1ID.fl_str_mv |
008865174-60 |
dc.contributor.advisor1Lattes.fl_str_mv |
http://lattes.cnpq.br/5984945942545807 |
dc.contributor.advisor-co1.fl_str_mv |
SANTOS NETO, Inocêncio Sanches dos |
dc.contributor.advisor-co1ID.fl_str_mv |
003589933-69 |
dc.contributor.advisor-co1Lattes.fl_str_mv |
http://lattes.cnpq.br/8490778593339511 |
dc.contributor.referee1.fl_str_mv |
SINFRÔNIO, Francisco Sávio Mendes |
dc.contributor.referee1ID.fl_str_mv |
008865174-60 |
dc.contributor.referee1Lattes.fl_str_mv |
http://lattes.cnpq.br/5984945942545807 |
dc.contributor.referee2.fl_str_mv |
COELHO, Paulo Henrique da Silva Leite |
dc.contributor.referee2Lattes.fl_str_mv |
http://lattes.cnpq.br/6597430849631821 |
dc.contributor.referee3.fl_str_mv |
PINTO, Mauro Sérgio Silva |
dc.contributor.referee3Lattes.fl_str_mv |
http://lattes.cnpq.br/0804349408744542 |
dc.contributor.authorID.fl_str_mv |
893236703-59 |
dc.contributor.authorLattes.fl_str_mv |
http://lattes.cnpq.br/1406951147120069 |
dc.contributor.author.fl_str_mv |
TERCEIRO, Lizandro do Amaral Oliveira |
contributor_str_mv |
SINFRÔNIO, Francisco Sávio Mendes SANTOS NETO, Inocêncio Sanches dos SINFRÔNIO, Francisco Sávio Mendes COELHO, Paulo Henrique da Silva Leite PINTO, Mauro Sérgio Silva |
dc.subject.por.fl_str_mv |
Ferrovia Heavy Haul Manutenção Estatística Teste ANOVA Teste Tukey |
topic |
Ferrovia Heavy Haul Manutenção Estatística Teste ANOVA Teste Tukey Heavy haul railway Maintenance Statistic ANOVA test Tukey test Ferrovias; Projetos e Construção |
dc.subject.eng.fl_str_mv |
Heavy haul railway Maintenance Statistic ANOVA test Tukey test |
dc.subject.cnpq.fl_str_mv |
Ferrovias; Projetos e Construção |
description |
This work aims to present the impact of the maintenance process of permanent and electro-electronic track in a Heavy Haul railway. The study points out the comparison between the basic, blocked maintenance and maintenance by distance formats applied between 2017 and 2019 (36 months) through the assessment of railway performance indicators. The performance of the failures of track and electro-electronic area, of the train hour stopped indicator, of the mean kilometer between stops indicator and the specific consumption yield were considered, using statistical analysis with ANOVA and Tukey tests, through the MATLAB® software by MathWorks. The conclusion of the analyzes allowed to indicate a better performance for the maintenance by distance format in the railway under study, ratified in the tests showed according to the characteristics indicated in these 3 years of evaluation of the numerical basis caused by the capacity increase process (railway duplication). |
publishDate |
2020 |
dc.date.issued.fl_str_mv |
2020-09-18 |
dc.date.accessioned.fl_str_mv |
2021-02-18T19:31:17Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/masterThesis |
format |
masterThesis |
status_str |
publishedVersion |
dc.identifier.citation.fl_str_mv |
TERCEIRO, Lizandro do Amaral Oliveira. Impacto do processo de manutenção de via permanente e eletroeletrônica na logística de transporte ferroviário. 2020.96 f. Dissertação (Programa de Pós-Graduação em Energia e Ambiente/CCET) - Universidade Federal do Maranhão, São Luís, 2020. |
dc.identifier.uri.fl_str_mv |
https://tedebc.ufma.br/jspui/handle/tede/tede/3198 |
identifier_str_mv |
TERCEIRO, Lizandro do Amaral Oliveira. Impacto do processo de manutenção de via permanente e eletroeletrônica na logística de transporte ferroviário. 2020.96 f. Dissertação (Programa de Pós-Graduação em Energia e Ambiente/CCET) - Universidade Federal do Maranhão, São Luís, 2020. |
url |
https://tedebc.ufma.br/jspui/handle/tede/tede/3198 |
dc.language.iso.fl_str_mv |
por |
language |
por |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Universidade Federal do Maranhão |
dc.publisher.program.fl_str_mv |
PROGRAMA DE PÓS-GRADUAÇÃO EM ENERGIA E AMBIENTE/CCET |
dc.publisher.initials.fl_str_mv |
UFMA |
dc.publisher.country.fl_str_mv |
Brasil |
dc.publisher.department.fl_str_mv |
DEPARTAMENTO DE ENGENHARIA DA ELETRICIDADE/CCET |
publisher.none.fl_str_mv |
Universidade Federal do Maranhão |
dc.source.none.fl_str_mv |
reponame:Biblioteca Digital de Teses e Dissertações da UFMA instname:Universidade Federal do Maranhão (UFMA) instacron:UFMA |
instname_str |
Universidade Federal do Maranhão (UFMA) |
instacron_str |
UFMA |
institution |
UFMA |
reponame_str |
Biblioteca Digital de Teses e Dissertações da UFMA |
collection |
Biblioteca Digital de Teses e Dissertações da UFMA |
bitstream.url.fl_str_mv |
http://tedebc.ufma.br:8080/bitstream/tede/3198/2/LizandroTerceiro.pdf http://tedebc.ufma.br:8080/bitstream/tede/3198/1/license.txt |
bitstream.checksum.fl_str_mv |
1e054157d27533930edef3b24e7bf433 97eeade1fce43278e63fe063657f8083 |
bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 |
repository.name.fl_str_mv |
Biblioteca Digital de Teses e Dissertações da UFMA - Universidade Federal do Maranhão (UFMA) |
repository.mail.fl_str_mv |
repositorio@ufma.br||repositorio@ufma.br |
_version_ |
1797055616288555008 |